Month: April 2007


  • Curtain Test Video: Updated

    Update. I did another test tonight and got the motion smoothed out. This is more of the effect I was aiming to achieve. WATCH MOVIE Here is my original post and first test: Another test clip. I am finishing the assembly of the stage curtain and wanted to see how it would animate. The answer…not…


  • Armature Test Clip 2

    I did another test tonight. I am thinking that this armature is a bit unstable and has some spring to it compared to a wire armature secured with epoxy putty. I may have to make an epoxy version of the same proportions and try similar tests to confirm which is more stable for movement. WATCH…


  • Armature Test Clip

    I filmed a quick test tonight using my recent armature design. Here is the result: WATCH MOVIE


  • Video: Frame Rate and a Fix for the Ghosting Effect

    In both Man Drawing a Reclining Woman and the Sword of Damocles I have what looks like ghosting in the animation. My process is to shoot 12 photos for each second of animation then stretch that sequence in Sony Vegas to 24fps. Vegas then blurs every other frame. When analyzing the footage within Vegas frame…


  • Set and Stage: Some Assembly Required

    Tonight I continued to put my set pieces back together and started shooting test photos to check alignment and spacing between the background, the stage, and the camera.


  • New Studio Setup

    I’m hoping to get back into production on the Vitruvius film in April. I’ve started to re-build my sets in my new studio. The following picture captures my carts and stages better than previous photos.


  • Community: Stopmotion Animators Meet Up

    Looks like some casual meetings took place on April 1, 2007 on both sides of the country. Here on the east coast, I was invited over to Takuro Masuda’s studio where he is filming his stop motion project for the Center for Puppetry Arts Experimental Puppetry Theater. His project involves Native American mythology and looks…